检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:柳厚祥 曹俊仁 LIU Houxiang;CAO Junren(College of Civil Engineering,Changsha University of Science and Technology,Changsha 410114,China)
机构地区:[1]长沙理工大学土木工程学院,湖南长沙410114
出 处:《湖南文理学院学报(自然科学版)》2024年第1期61-66,共6页Journal of Hunan University of Arts and Science(Science and Technology)
基 金:长沙理工大学实践创新项目(SJCX202117)。
摘 要:以洞庭湖区义合金鸡垸的防洪堤坝作为研究背景,利用ABAQUS软件对该防洪堤坝进行动静力分析,为了保证分析计算的准确与效率,对静力计算和动力计算采用不同的土体本构模型,静力计算选用Duncan-Chang模型,动力计算则采用等效黏弹性模型。基于抗液化剪应力法,再结合有限元计算的结果,对湖区堤坝地基的液化情况做出判别。并提出采用表面压重的加固措施,选取不同厚度计算验证,最后确定压重厚度为3.5m时,满足工程安全要求;静力作用下,防洪堤坝应力分布合理,加固后没有造成过大的沉降,而水压力引起的拉应力区域明显减少,向背水方向的水平位移也减小了一半;对加固前后应变较大的几个单元做出液化判别,结果表明,加固后堤坝地基在地震作用下不再发生液化现象。Taking a section of flood control dam of Yihejinji polder land in Dongting Lake area as the research background,this paper carries out dynamic and static analysis of the flood control dam by ABAQUS software.In order to ensure the accuracy and efficiency of the analysis and calculation,different soil constitutive models are used for static calculation and dynamic calculation.The Duncan-Chang model is used for the former,and the equivalent linear viscoelastic model for the latter.Based on the anti-liquefaction shear stress method and the results of finite element calculation,this paper makes a judgment on the liquefaction of the dam foundation in the lake area.The reinforcement measures of surface cover weight are proposed,and different thicknesses are selected for calculation and verification.Finally,when the cover weight thickness is 3.5 m,the project safety requirements are met.Under the action of static force,the stress distribution of flood control dam is reasonable,and no excessive settlement is caused after reinforcement,while the tensile stress area caused by water pressure is obviously reduced,and the horizontal displacement to the backwater direction is also reduced by half.The liquefaction discrimination of several units with large strain before and after reinforcement is made.The results show that after reinforcement,the liquefaction of the dam foundation no longer occurs under the action of earthquake.
分 类 号:TV871[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.104.210