检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:秦云龙 Qin Yunlong(Liuwan Coal Mine,Fenxi Mining Group,Xiaoyi Shanxi 032300,China)
出 处:《机械管理开发》2024年第1期299-301,共3页Mechanical Management and Development
摘 要:针对8206回风巷厚煤顶动压影响巷道存在的顶板易随采随冒的问题,综合运用现场调研、文献检索、理论分析等研究方法,分析该巷道原支护方案的缺陷及应该优化的方向,设计了一套“高预应力锚索整体支护方案”,并成功进行了工程实践。掘进支护后的矿压观测表明,实施优化后的支护方案后,巷道顶底板移近量、两帮移近量、顶板离层值均得到了有效控制,实现了安全高效掘进。Aiming at the support problem of the thick coal top dynamic pressure affected roadway in 8206 returm airway,we comprehensively applied the research methods such as on-site research,literature search,theoretical analysis,etc.,analysed the defects of the original support scheme of this roadway and the direction that should be optimised,and designed a set of"high prestressing anchor cable overall support scheme",which has been successfully carried out in the engineering practice.The observation of mine pressure after digging support shows that after the implementation of the optimised support scheme,the amount of top and botom plate migration,the amount of two gangs migration,and the value of top plate off layer have been effectively controlled,and safe and efficient digging has been achieved.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43