检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周人飞 刘勋楠 刘玉[2] ZHOU Renfei;LIU Xunnan;LIU Yu(China Nation Heavy Machinery Corporation,Beijing 100070,China;China Institute of Water Resources and Hydropower Research,Beijing 100038,China)
机构地区:[1]中国重型机械有限公司,北京100070 [2]中国水利水电科学研究院,北京100038
出 处:《广东水利水电》2024年第1期51-56,共6页Guangdong Water Resources and Hydropower
基 金:国家重点研发计划项目(编号:2021YFC3090102);引江济淮工程混凝土抗裂性能及温控措施关键技术研究(编号:YJJH-ZT-ZX-20190829180)。
摘 要:混凝土裂缝是影响水工结构强度和耐久性的主要因素之一,东南亚地区全年高温多雨,月均最大温差较小(8.6℃),年均温差大(20.2℃),混凝土温度容易控制,但裂缝问题时有发生。依托东南亚地区某碾压混凝土坝,采用有限元研究施工期温度应力的变化规律,分析混凝土开裂的敏感因素,并就其温控防裂措施开展详细研究。结果表明,浇筑长间歇及寒潮侵袭显著影响混凝土温度应力的变化,老混凝土的强约束作用及新老混凝土的温差影响叠加寒潮应力,导致混凝土应力超标出现温度裂缝。在上述研究的基础上,进一步探讨了降低新浇混凝土温度应力的温控措施,为东南亚地区大体积混凝土工程的建设提供一定的参考。Concrete cracking is one of the primary factors affecting the strength and durability of hydraulic structures.The Southeast Asian region experiences high temperatures and heavy rainfall throughout the year,with a small average monthly maximum temperature difference of 8.6℃and a large average annual temperature difference of 20.2℃.Although concrete temperature is relatively easy to control,cracking issues still occur.Based on the roller-compacted concrete dam in Southeast Asia,the characteristics of temperature stress during the construction period were studied using finite element.Sensitivity factors for concrete cracking were analyzed,and detailed research was conducted on temperature control and crack prevention measures.The results show that the long intervals between pouring and cold wave have a significant impact on the change of concrete temperature stress.The strong constraint effect of old concrete and the temperature difference between fresh and old concrete add up to cold stress,leading to concrete stress exceeding the limit and temperature cracks.Furthermore,temperature control measures were explored to reduce thermal stress in newly poured concrete,providing valuable references for the construction of large-volume concrete projects in Southeast Asia.
关 键 词:碾压混凝土坝 长间歇 寒潮 非均匀地基 裂缝 温控防裂措施
分 类 号:TV698.231[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.158