检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李骏 Li Jun(No.2 Colliery,Shanxi Huayang Group New Energy Co.,Ltd.,Yangquan,Shanxi 045008)
机构地区:[1]山西华阳集团新能股份有限公司二矿,山西阳泉045008
出 处:《江西煤炭科技》2024年第1期15-17,21,共4页Jiangxi Coal Science & Technology
摘 要:根据阳煤二矿81104综放工作面构造预测及钻探结果,判定工作面内褶曲构造发育;结合工作面煤层变化趋势、顶底板岩性及机组割岩能力等方面分析,该构造对工作面正常回采影响较大区域为1 050~1 250 m(进风侧0~100 mm范围内);拟定“硬过构造区域”、“构造区整体跳采”、“构造区绕巷跳采”三种过构造开采方案进行比较,即从矿井生产、技术、通风、经济效益等方面进行综合分析后,认为“绕巷跳采”方案准备时间最短、经济效益最好,为最优方案。Based on the structural forecast and drilling results at 81104 fully-mechanized caving face in No.2 Colliery of Shanxi Huayang Group New Energy Co.,Ltd.,the paper determines the working face to be folding structural development,and presents three mining schemes of forced crossing tectonic area,whole skip-mining and detouring skip-mining in tectonic area according to coal seam variation trend,roof and floor lithology and rock cutting capacity of units at working face,determining the detouring skip-mining is the optimal scheme with shortest available time and best economic benefits by comprehensive analysis from the aspects of production,technology,ventilation and economic benefits.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.91.46