检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵坤 ZHAO Kun(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041
出 处:《云南水力发电》2024年第1期149-152,共4页Yunnan Water Power
摘 要:土石方是工程建设中一项基础性的工作,并且是工程造价中重要部分之一。为提高土石方计算精度,以及后续工程款拨付的依据,对数字地面模型(DTM)法、断面法和方格网法,根据大型土石方实测数据,使用3种方法分别对2地块进行计算土石方工程量。结果表明:DTM法计算土石方量在不规则地形条件下大型土石方外运中比较适合。Earthwork is a fundamental task in engineering construction and an important part of project cost.In order to improve the accuracy of earthwork calculation and provide a basis for subsequent engineering payment,based on large-scale earthwork measurement data,this paper uses three methods:digital terrain model(DTM)method,cross section method,and grid method to calculate the earthwork quantity for two plots.The results indicate that DTM method is more suitable for calculating the volume of earthwork in large-scale earthwork transportation under irregular terrain conditions.
分 类 号:TU751[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.107.172