检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:ZHAI Bi-yao YANG Fan PAN Jun-ning XIE Dong-mei
机构地区:[1]River and Harbour Engineering Department,Nanjing Hydraulic Research Institute,Nanjing 210029,China [2]The National Key Laboratory of Water Disaster Prevention,Nanjing 210098,China
出 处:《China Ocean Engineering》2023年第6期885-896,共12页中国海洋工程(英文版)
基 金:jointly supported by the National Key R&D Program of China (Grant No.2021YFB2600700);the Central PublicInterest Scientific Institution Basal Research Fund of China (Grant Nos.Y221007 and Y223005)。
摘 要:Serious ice accumulating,pile-up and ice jamming occur around the conductor array of offshore jacket platforms during the winter every year in Bohai Sea,which could cause grave threats to the stability of platform structure,the safety of people and equipment,and even severer calamity.Therefore,the process of ice accumulation and ice jamming in the jacket platform area needs more concern.This study focuses on ice accumulation and jamming behaviors in the jacket platform conductor area by using a coupled two-dimensional hydro-ice dynamics model.A series of cases are conducted with different flow conditions,such as flow velocity,drifting direction and oscillatory flow.Through the simulation,the ice pile-up process is described and changes in ice-jamming thickness,ice pile-up location and ice pile-up volume are investigated.The differences in ice pile-up in the steady flow and oscillatory flow are analyzed.This study proposes a new approach to simulate the ice jamming process in the jacket platform conductor area,providing a reference for ice management on the platform.
关 键 词:sea ice ice jamming conductor array numerical modeling hydro-ice dynamics
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112