检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡中华 罗利 李彪[2] 李强 彭思 谭强 HU Zhonghua;LUO Li;LI Biao;LI Qiang;PENG Si;TAN Qiang(China MCC5 Group Co.,Ltd.,Chengdu,Sichuan 610023,China;Southwest Petroleum University,Chengdu,Sichuan 610599,China;New City Construction Co.,Ltd.of Chengdu Tianfu Investment Group Co.,Ltd.,Chengdu,Sichuan 610218,China)
机构地区:[1]中国五冶集团有限公司,四川成都610023 [2]西南石油大学,四川成都610599 [3]成都天投新城市建设投资有限公司,四川成都610218
出 处:《施工技术(中英文)》2023年第24期26-32,共7页Construction Technology
基 金:国家自然科学基金青年项目(51809221);国家自然科学基金面上项目(42277461)。
摘 要:毛家湾污水处理厂进厂干管施工主要采用顶管法,顶管施工过程中上跨地铁,必然导致地铁变形。采用GeoMos监测系统对地铁变形进行监测。结合施工日志,对地铁变形的时间、空间特征进行分析。研究表明:顶管施工期间,地铁会持续变形;始发井恢复期间,地铁变形值增加最快;顶管施工过程中地铁整体位移与顶管方向一致,但局部区域位移方向与顶管方向相反。地铁顶部竖向位移沿纵向呈“V”字形对称分布;对于同一横断面,顶拱位移下降,而底部位移向上,这是由顶管顶进过程中的挤压效应引起。可在顶管施工过程中采用钢管或球墨铸铁管上跨地铁施工,顶管机头出洞后先恢复接收井的方式减少顶管施工对地铁的扰动作用。The trunk sewer of Maojiawan Sewage Disposal Plant is mainly constructed through pipe jacking.It overpasses subway,which will induce deformation of subway.The deformation is monitored utilizing GeoMos monitoring system.Combined with the construction log,the time and space characteristics of the deformation are analyzed.The result shows that the subway deformation steadily increases during the pipe jacking.The deformation of the subway increases the fastest during the starting shaft recovering.The general displacement of the existing subway is in the direction with the pipe jacking,but the displacement in local region is in opposite.The deformation distribution is similar to letter“V”along the longitudinal direction.The displacement at top of the arch points down and the displacement at bottom of the arch points up.The phenomenon is induced by extrusion effect of the soil driven by pipe jacking.The disturbance action of subway caused decreases by pipe jacking using steel pipe or ball mill cast iron pipe and recovering receiving shaft firstly after pipe jacking.
关 键 词:地铁 污水干管 顶管 变形 监测 挤压效应 施工技术
分 类 号:TU990.3[建筑科学—市政工程] U231.3[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.112.164