检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王翔 Wang Xiang(Jiaozuo Coal Zhaogu(Xinxiang)Energy Co.,Ltd.,Xinxiang 453634,China)
机构地区:[1]焦作煤业赵固(新乡)能源有限责任公司,河南新乡453634
出 处:《煤炭与化工》2023年第12期58-60,64,共4页Coal and Chemical Industry
摘 要:矿井水害是影响赵固一矿安全开采的主要危害,尤其是构造导通深部含水层引发大的突水是矿井水害的最主要形式,对矿井安全生产影响大,本文以赵固一矿15031工作面地面区域水害治理工程注10孔为例,通过定向钻孔探查及治理F15、DF102断层,采取探查及治理相结合的模式,为赵固井田底板加固的构造探查与治理提供依据。Mine water damage was important hazard affecting the safe mining of Zhaogu No.1 Mine.In particular,the large water outburst caused by the structure conducting the deep aquifer was important form of mine water damage,which had the great impact on the safe production of the mine.Taking the No.10 injection hole in the ground regional control construction of No.15031 Face of Zhaogu No.1 Mine as an example,through the directional drilling exploration and control of F15 and DF102 faults,the combination of exploration and control was adopted to provide the basis for the structural exploration and control of floor reinforcement in Zhaogu field.
分 类 号:TD74[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.91