摘  要:分析了双侧加宽公路路基路面变形特性与控制方法,建立了有限元分析模型,探讨了新旧路基变形特征与力学响应变化,通过参数选择,对比了台阶开挖与桩土复合地基在不同条件下的处置应用情况。建议在新旧公路台阶开挖施工中采用1∶1.25~1∶1.5高宽比,高度控制在0.8~1 m,宽度控制在1~1.5 m。在桩土复合地基处置中,需根据桩数、桩径、桩间距及桩长的影响效果进行合理控制,应布设6根桩体,将桩间距控制在2 m左右,以提升施工经济效益,达到施工要求。The study analyzes the deformation characteristics and control methods of double-side widened highway roadbed,establishes the finite element analysis model,discusses the deformation characteristics and mechanical response changes of the old and new roadbed,and compares the treatment and application of step excavation and pile soil composite foundation under different conditions through parameter selection.It is suggested that the height ratio of 1∶1.25~1∶1.5 should be adopted in the excavation of new and old highway steps,and the height should be controlled at 0.8~1 m and the width should be controlled at 1~1.5 m.In the disposal of pile-soil composite foundation,it is necessary to reasonably control the effect of pile number,diameter,spacing and length,lay six piles,and control pile spacing at about 2 m to improve the economic benefits of construction and meet the construction requirements.

关 键 词:新旧路基变形特征 桩土复合地基 变形控制 有限元模型 台阶开挖 

分 类 号:U416[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象