检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭萍 GUO Ping(Bozhou Qiaocheng District Water Conservancy Bureau,Bozhou 236800,Anhui,China)
机构地区:[1]安徽省亳州市谯城区水利局,安徽亳州236800
出 处:《水利科技与经济》2024年第1期36-40,47,共6页Water Conservancy Science and Technology and Economy
摘 要:为了加强对河道水闸闸墩裂痕问题的防治力度,推进河道水闸整治工程建设,建立闸墩有限元模型,研究温差应力、浇筑时间间隔与闸墩裂痕的关系。结果显示,随着施工间隔的增加,底板和闸墩的最大拉应力呈递增趋势,更容易产生裂缝;设置冷凝管的闸墩在第5天的最大应力相较于设置前的最大应力减少100 kPa。研究表明,合理的闸墩浇筑时间间隔与冷凝管的敷设,能够有效预防和治理河道水闸闸墩的裂痕问题。In order to strengthen the prevention and control of the crack problem of channel sluice pier and promote the construction of channel sluice renovation project,the finite element model of channel sluice pier was proposed to study the relationship between temperature difference stress,pouring time interval and the crack of channel sluice pier.The results show that with the increase of construction interval,the maximum tensile stress of base plate and pier increases,and cracks are more likely to occur.On day 5,the maximum stress of the sluice block with the condensate pipe is reduced by 100 kPa compared to the maximum stress before the installation.The results show that reasonable time interval of pier pouring and laying of condensing pipe can effectively prevent and cure the crack problem of channel sluice pier.
关 键 词:水闸闸墩 裂痕成因 有限元分析 冷凝管敷设 温度应力场
分 类 号:TV662.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.132.143