作  者:王秀丽[1,2] 邓超 陈志华 WANG Xiu-li;DENG Chao;CHEN Zhi-hua(School of Civil Engineering,Lanzhou University of Technology,Lanzhou 730050,China;Western Center of Disaster Mitigation in Civil Engineering of Ministry of Education,Lanzhou University of Technology,Lanzhou 730050,China;School of Civil Engineering,Tianjin University,Tianjin 300072,China)

机构地区:[1]兰州理工大学土木工程学院,甘肃兰州730050 [2]兰州理工大学西部土木工程防灾减灾教育部工程研究中心,甘肃兰州730050 [3]天津大学建筑工程学院,天津300072

出  处:《空间结构》2023年第4期72-79,共8页Spatial Structures

基  金:国家自然科学基金项目(51778273);甘肃省住房与城乡建设厅建设科技项目(JK2020-26)。

摘  要:青海大学篮球馆采用大跨度凹形平面桁架结构,采用砂箱式临时支撑.通过MIDAS/GEN对分级对称同步卸载的两种方案进行对比,验证了凹形桁架应采取从两边向中间卸载的方法.对结构的应力和位移进行监测,监测结果显示,分级卸载可以避免结构出现反翘现象,并且应力值变化较小.分析和监测结果共同表明,在卸载过程中,位移和应力的变化曲线较吻合,且数值均在合理的设计范围内,计算模型与实际施工过程具有一致性,验证了有限元模拟可以指导施工的顺利进行.通过同步卸载与不同步卸载对比分析,尚未完成卸载的临时支撑上方桁架的应力变化较大,其中腹杆应力变化最大,在卸载过程中应采取措施保证施工同步进行.The Basketball Hall of Qinghai University employs a large-span concave plane truss structure,which adopts sand box temporary support.By comparing the two schemes of symmetrical synchronous step unloading through MIDAS/Gen,it is verified that the concave truss should be unloaded from both sides to the middle.The stress and displacement of the structure are monitored.The monitoring results show that step unloading can avoid the warping phenomenon of the structure,and the change of stress value is small.The analysis and monitoring results show that the change curves of displacement and stress are consistent in the unloading process,the values are within the reasonable design range,and the calculation model is consistent with the actual construction process.It is verified that the finite element simulation can guide the smooth progress of construction.Through the comparative analysis of synchronous unloading and asynchronous unloading,the stress of the truss above the temporary support that has not been unloaded changes greatly,among which the stress of the web member changes the most.During the unloading process,measures should be taken to ensure the synchronous construction.

关 键 词:结构健康监测 施工阶段 卸载 凹形桁架 大跨度钢桁架 

分 类 号:TU393.3[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象