检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:林顺富 张琪 沈运帷 周波 边晓燕 李东东 LIN Shunfu;ZHANG Qi;SHEN Yunwei;ZHOU Bo;BIAN Xiaoyan;LI Dongdong(College of Electrical Engineering,Shanghai University of Electric Power,Shanghai 200090,China;Shanghai Key Laboratory of Smart Grid Demand Response,Shanghai 200063,China)
机构地区:[1]上海电力大学电气工程学院,上海200090 [2]上海市智能电网需求响应技术重点实验室,上海200063
出 处:《电力系统保护与控制》2024年第2期90-100,共11页Power System Protection and Control
基 金:国家自然科学基金项目资助(51977127);上海市教育发展基金会和上海市教育委员会“曙光计划”项目资助(20SG52);上海市青年科技英才扬帆计划项目资助(21YF1414700);上海市教育委员会和上海市教育发展基金会“晨光计划”项目资助(21CGA64)。
摘 要:随着高比例新能源接入电网,新能源出力和负荷的波动性及不确定性对系统的灵活爬坡能力提出更高的要求。提出了一种面向灵活爬坡服务的针对高比例新能源电力系统中常规发电机组、储能、柔性负荷等可调节资源的优化调度模型。首先,提出一种考虑日前预测净负荷不确定性的灵活爬坡需求估计方法,根据爬坡起始和结束时刻净负荷及其安全裕度,量化估计电力系统灵活爬坡需求。其次,基于生成的净负荷不确定性场景,提出了考虑系统灵活爬坡需求的基于两阶段混合整数线性规划的可调节资源优化调度模型,从日前-实时两个阶段实现可调节资源的优化调度。最后,基于IEEE-RTS-24节点系统,在4种典型方案场景下对比验证所提优化调度模型。结果表明所提模型能有效提升系统灵活性,降低系统运行成本。With the integration of a high proportion of renewable energy,the fluctuations and uncertainties bring a higher demand on the flexible ramping capacity of the power system.This paper proposes an optimal dispatch of adjustable resources such as conventional generation units,energy storage systems and flexible loads of the power system for a flexible ramping product(FRP).First,an estimation method of the flexible ramping requirements considering the uncertainties of the day-ahead forecasting net load is proposed according to the start-and end-time net load and its safety margin to quantitatively estimate flexible ramping requirements.Second,based on the generated uncertain scenarios of the net load,it proposes an optimal dispatching model of the adjustable resources with a two-stage mixed-integer linear programming approach.The dispatching model is implemented from the day-ahead unit commitment and real-time economic dispatch.Finally,four typical cases are considered to compare and validate the optimal dispatching model based on the IEEE-RTS-24 bus system.The results show that the proposed dispatching model can effectively improve system flexibility and reduce operating costs.
关 键 词:新能源 可调节资源 灵活爬坡服务 混合整数线性规划 优化调度
分 类 号:TM73[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222