检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蔡成楠 CAI Chengnan
机构地区:[1]福州市建筑设计院有限责任公司,福建福州350109
出 处:《福建建设科技》2024年第1期75-78,共4页Fujian Construction Science & Technology
摘 要:本项目结构上采用增设抗震墙的间接加固方式,将结构体系由框架结构提升改造为框-剪结构,提高了结构的抗震性能,使得加固位置少,加固量小,同时采用BIM技术全过程设计支持改造加固项目,通过BIM精细化建模,模拟施工,及时指导、调整设计。从设计系统上实现建筑改造、加固、装修、设备设计一体化,从而提升项目设计品质。This project adopts the indirect reinforcement method of adding seismic walls on the structure,upgrading the structural system from a frame structure to a frame shear structure,improving the seismic performance of the structure,reducing the number of reinforcement positions and the amount of reinforcement.At the same time,BIM technology is used to support the entire process design of the renovation and reinforcement project.Through fine modeling and simulation of construction,BIM technology is used to guide and adjust the design in a timely manner.It realizes the integration of building renovation,reinforcement,decoration,and equipment design from the design system,thereby improving the quality of project design.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.189.185.100