新平县大红山铜矿三维地质建模技术研究综述  

Review of 3D Geological Modeling Technology for Dahongshan Copper Mine in Xinping County

在线阅读下载全文

作  者:杨俊楠 额春海 陆博 杨玉明 陈相吉 李陈智 YANG Jun-nan;E Chun-hai;LU Bo;YANG Yu-ming;CHEN Xiang-ji;LI Chen-zhi(Geological,Geophysical and Chemical Exploration Institute of Yunnan Nonferrous Geological Bureau,Kunming 650216,China;Yuxi Mining Co.,Ltd.,Yuxi 653405,China)

机构地区:[1]云南省有色地质局地质地球物理化学勘查院,云南昆明650216 [2]玉溪矿业有限公司,云南玉溪653405

出  处:《世界有色金属》2023年第21期100-102,共3页World Nonferrous Metals

摘  要:三维地质建模作为数字矿山建设的重点核心内容之一,近年来已经成为研究热点。随着计算机技术的不断发展,三维地质建模技术也在不断更新。文章梳理了目前新平县大红山三维建模技术的研究进展,包括三维地质建模的空间数据模型、建模方法,并介绍距离幂次反比法在大红山铜矿三维地质建模中的应用。As one of the key contents of digital mine construction,3D geological modeling has become a research hotspot in recent years.With the continuous development of computer technology,3D geological modeling technology is also constantly updated.This paper reviews the research progress of 3D modeling technology of Dahongshan Mountain in Xinping County,including 3D geological modeling spatial data model and modeling methods,the application of inverse ratio method of distance power in 3D geological modeling of Dahongshan copper mine is introduced.

关 键 词:大红山铜矿 空间数据模型 三维地质建模 

分 类 号:P628[天文地球—地质矿产勘探]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象