检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:龚华[1] GONG Hua(Anhui Shui'an Construction Group Co.,Ltd,Hefei 230601,China,Hefei 230601,China)
机构地区:[1]安徽水安建设集团股份有限公司,安徽合肥230601
出 处:《安徽水利水电职业技术学院学报》2023年第4期5-9,19,共6页Journal of Anhui Technical College of Water Resources and Hydroelectric Power
摘 要:文章结合滁州内城河闸站导流实例,介绍全断面双导流方案的导流标准确定、水力计算、导流建筑物设计、导流施工等。Based on the diversion example,this paper compares the investment,construction period and feasibility of the staged and segmented diversion with the full-section double diversion in flood season,and designs and determines the diversion scheme suitable for the project.The determination of diversion standard,hydraulic calculation,diversion structure design,diversion construction and emergency disposal of the full section double diversion scheme are introduced in detail.
分 类 号:TV551.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49