检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Monika Saini Bhavan Lal Patel Ashish Kumar
机构地区:[1]Department of Mathematics&Statistics,Manipal University Jaipur,Jaipur-303007,India
出 处:《哈尔滨工程大学学报(英文版)》2023年第4期751-761,共11页Journal of Marine Science and Application
摘 要:For the successful operation of any industry or plant continuous availability of power supply is essential.Many of the large-scale plants established their power generation units.Marine power plant having two generators is also fall in this category.In this study,an effort is made to derive and optimize the availability of a marine power plant having two generators,one switch board and distribution switchboards.For this purpose,a mathematical model is proposed using Markov birth death process by considering exponentially distributed failure and repair rates of all the subsystems.The availability expression of marine power plant is derived.Metaheuristic algorithms namely dragonfly algorithm(DA),bat algorithm(BA)and whale optimization(WOA)are employed to optimize the availability of marine power plant.It is revealed that whale optimization algorithm outperforms over dragonfly algorithm(DA),and bat algorithm(BA)in optimum availability prediction and parameter estimation.The numerical values of the availability and estimated parameters are appended as numerical results.The derived results can be utilized in development of maintenance strategies of marine power plants and to carry out design modifications.
关 键 词:Markov process Whale optimization algorithm Dragonfly algorithm AVAILABILITY Marine power plant
分 类 号:U664.1[交通运输工程—船舶及航道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.19.244.133