大跨度机库网架整体提升施工技术  

INTEGRAL LIFTING CONSTRUCTION TECHNOLOGY OF LARGE-SPAN HANGAR GRID

在线阅读下载全文

作  者:龙绍章 唐伟 LONG Shao-zhang;TANG Wei(China Huashi Enterprises Company Limited.,518000,Shenzhen,Guangdong,China)

机构地区:[1]中国华西企业有限公司,广东深圳518000

出  处:《建筑技术》2023年第24期3009-3011,共3页Architecture Technology

摘  要:近年来,整体提升技术在网架施工中的应用越来越多,工艺日益趋近成熟。不同工程施工状况,对提升的整体流程又有所不同,川航维修机库因大门桁架与大厅网架最下层存在3.4 m高差,在采用整体提升方案的同时,引入二次提升以及吊点置换技术使网架顺利安装就位。In recent years,the integral lifting technology has been applied more and more in the construction of space truss,and the technology is becoming more and more mature.Different engineering construction conditions have different overall lifting processes.Because there is a 3.4 meter high difference between the gate truss and the bottom floor of the hall grid in the maintenance hangar of Sichuan Airlines,the overall lifting scheme is adopted,and the secondary lifting and lifting point replacement technologies are introduced to make the grid smoothly installed in place.

关 键 词:整体提升 机库网架 二次提升 吊点置换 

分 类 号:TU758.1[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象