阳新高速公路黄河特大桥跨大堤桥式设计与布置  被引量:1

Cross Levee Type Design and Layout of Yellow River Super Large Bridge Across Yangxin Expressway

在线阅读下载全文

作  者:孟全 徐珂[2] 郭建光 王超 MENG Quan;XU Ke;GUO Jianguang;WANG Chao(Henan Second Highway Engineering Co.,Ltd.,Zhengzhou,Henan 450000,China;Henan University of Economics and Law,Zhengzhou,Henan 450046,China;Zhengzhou Communications Construction Investment Co.,Ltd.,Zhengzhou,Henan 450001,China)

机构地区:[1]河南省第二公路工程有限公司,河南郑州450000 [2]河南财经政法大学,河南郑州450046 [3]郑州交通建设投资有限公司,河南郑州450001

出  处:《黑龙江交通科技》2024年第2期94-98,103,共6页Communications Science and Technology Heilongjiang

摘  要:阳新高速公路黄河特大型桥梁跨大堤桥水文地质特征独特、条件复杂,抗震设防烈度高,而且冲刷大、主河槽摆动大,对桥梁稳定性和耐用性要求较高。桥式和桥跨的设计需要充分考虑黄河综合治理、开发利用、防洪规划、通航标准等因素。同时,选择合理布跨、确定桥型方案时,不仅要满足桥位处黄河Ⅳ级航道的要求,还要综合考虑沿线地形、水文、环保等多方面因素,使之与其他干线公路互联,并实现公路与境内铁路对接联通,形成现代综合交通运输体系。鉴于该黄河特大桥实际长度达2240 m,设计时应重视桥型方案选择,降低桥梁施工难度,减少工程造价,便于桥梁建设施工。通过对比分析黄河特大型桥梁桥式设计与跨大堤桥布置方案后,选择结构受力合理、施工经验成熟、造价低及后期维护量小的预应力混凝土连续梁桥作为优选设计方案。The super large bridge across the Yellow River on the Yangxin Expressway has unique characteristics,complex conditions,high seismic fortification intensity,large erosion,large swings in the main channel,and high requirements for bridge stability and durability.The design of bridge type and bridge span should take into full consideration the comprehensive management of the Yellow River,development and utilization,flood control planning,navigation standards and other issues.At the same time,when choosing a reasonable span and determining the bridge type,not only must the bridge be located in the Yellow River IV channel requirements,but also comprehensively consider the terrain,hydrology,environmental protection and other factors along the line to connect it with other arterial highways,and realize the docking and connection of highways and domestic railways,forming a modern comprehensive transportation system.In view of the fact that the actual length of the Yellow River Bridge is 2240 m,attention should be paid to the selection of bridge type schemes in the design to reduce the difficulty of bridge construction,reduce engineering costs,and facilitate bridge construction.This paper compares and analyzes the bridge design of the Yellow River super large bridge and the layout of the bridge across the levee,and selects a prestressed concrete continuous beam bridge with reasonable structural force,mature construction experience,low cost and low maintenance later as the optimal design scheme.

关 键 词:特大型桥梁 设计 跨大堤桥 路网衔接 方案比选 

分 类 号:U442[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象