检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张枭鸣 Zhang Xiaoming(SGIDI Engineering Consulting Co.,Ltd.,Shanghai 200092,China)
机构地区:[1]上海勘测设计研究院有限公司,上海200092
出 处:《陕西水利》2024年第2期59-62,共4页Shaanxi Water Resources
摘 要:基于InfoWorks ICM构建1D、2D耦合的浙江省某新区内涝排水模型,根据模拟得出的研究区管网负荷状态、地面积水深度、地面积水时间等,分析和评价研究区管网排水能力和内涝风险情况。研究区现状管网系统的排水能力尚未达到3年一遇的排水设计标准,管网排水能力大部分在0.5年一遇之下。且在20年一遇设计暴雨下存在内涝高风险区,内涝风险区主要发生在下垫面硬质化较为严重、地势较低、管网缺失和管径较小的区域。建议完善研究区空白区排水管网系统,并对未达到设计标准的管网进行改造。Based on InfoWorks ICM,a 1D and 2D coupled waterlogging and drainage model of a new district in Zhejiang Province was constructed.The drainage capacity and waterlogging risk of the pipeline network in the study area were analyzed and evaluated according to the simulated load state of the pipeline network,the depth of ground water and the time of ground water in the study area.The drainage capacity of the current pipe network system in the study area has not reached the design standard of once-in-3-years drainage,and the drainage capacity of the pipe network is mostly below 0.5 once-in-ayear.There are high risk areas of waterlogging under a 20-year design rainstorm,and the waterlogging risk areas mainly occur in areas where the underlying surface is hard,the terrain is low,the pipe network is missing and the pipe diameter is small.It is suggested to improve the drainage pipe network system in the blank area of the study area,and to reform the pipe network that does not meet the design standard.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171