作 者:王珏 Wang Jue(Shenyang Puhe Land Service Co.,Ltd.,Shenyang 110000,Liaoning)
机构地区:[1]沈阳浦河土地服务有限公司,辽宁沈阳110000
出 处:《陕西水利》2024年第2期124-126,129,共4页Shaanxi Water Resources
摘 要:为了分析彰武县2019年高效节水灌溉项目可行性,项目区设计水平年多年平均地下水资源可利用量为741.08万m^(3),设计水平年总需水量为375.63万m^(3),地下水资源量大于总需水量。项目实施过程中无需从外界客土,开挖土方就地回填,回清淤土方就近堆放沟边或就近填坑处理,不向项目区外运输,经分析评价项目可实现水土资源平衡。n order to analyze the feasibility of high-efficiency water-saving irrigation project in Zhangwu County in 2019,the average annual availability of groundwater resources in the project area is 7,410,800 m at the design level,and the total annual water demand at the design level is 3,756,300 m^(2),with the groundwater resources greater than the total water demand.During the implementation of the project,it is not necessary to excavate the external passenger soil,backfill it on the spot,return the dredged soil to the nearby ditch or fll the nearby pit for treatment,and do not transport it outside the project area.Through analysis and evaluation,the project can achieve the balance of water and soil resources.
分 类 号:S274[农业科学—农业水土工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222