检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:沈峰 Shen Feng(Jiangyin Xingcheng Special Steel Co.,Ltd.,Jiangyin Jiangsu 214400,China)
机构地区:[1]江苏省江阴兴澄特种钢铁有限公司,江苏江阴214400
出 处:《山西冶金》2023年第12期188-190,共3页Shanxi Metallurgy
摘 要:为了确保2号高炉休风47h后顺利复风,在休风前分2段集中加适量的净焦,减轻焦炭负荷,控制好炉温、炉渣碱度,确保设备正常运行。选择合适位置堵风口,保证合理送风面积,实现快速复风。复风后,通过合理调剂炉温、碱度,渣铁流动性好,炉前工作量小,出铁顺畅,达到了预期效果。In order to ensure a smooth resumption of air flow after a 47 hour shutdown of the No.2 blast furnace,an appropriate amount of clean coke was added in two stages before the shutdown to reduce the coke load,control the furnace temperature and slag alkalinity,and ensure the normal operation of the equipment.Choose a suitable location to block the air outlet,ensure a reasonable air supply area,and achieve rapid ventilation.After re blowing,by adjusting the furnace temperature and alkalinity reasonably,the slag iron flowability was good,the pre-furnace work volume was small,and the iron tapping was smooth,achieving the expected effect.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43