检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:丁大明 Ding Daming(Shanxi Coking Coal Huozhou Coal Electricity Pangpangta Coal Mine,Linxian Shanxi 033200,China)
机构地区:[1]山西焦煤霍州煤电庞庞塔煤矿,山西临县033200
出 处:《山西冶金》2023年第12期248-249,共2页Shanxi Metallurgy
摘 要:针对山西某矿1200运输上山掘进过含水层段后顶板漏水问题,提出综合采用漏水点封堵注浆、帷幕注浆方式进行防治水。在顶板漏水点附近针对性布置注浆钻孔,可实现漏水裂隙有效封堵,巷道过含水层段通过帷幕注浆可实现全段封堵,避免后溪巷道出现漏水情况,并提高含水层段围岩控制效果。对1200运输上山顶板漏水防治钻孔布置参数及注浆加固参数等进行详细设计,并进行工程应用。现场应用后,1200运输上山顶板基本不再出现漏水情况,围岩整体强度及稳定性也有所提升,注浆加固取得显著效果。In response to the problem of water leakage in the roof of a mine in Shanxi Province after 1200 transportation and tunneling through the aquifer section,a comprehensive method of sealing and grouting at the leakage point and curtain grouting is proposed to prevent water leakage.Targeted grouting boreholes can be arranged near the leakage point of the roof to effectively seal the water leakage cracks.The entire section of the roadway passing through the aquifer can be sealed through curtain grouting,avoiding water leakage in the rear stream roadway and improving the control effect of the surrounding rock in the aquifer section.Detailed design and engineering application of drilling layout parameters and grouting reinforcement parameters for preventing water leakage on the roof of the 1200 transportation mountain.After on-site application,there was basically no water leakage in the 1200 transportation of the mountaintop slab,and the overall strength and stability of the surrounding rock were also improved.The grouting reinforcement achieved significant results.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90