地铁车站基坑支护中盖挖半逆作法施工技术研究  

Research on Construction Technology of Mid-cover of Foundation Pit Support in Subway Station

在线阅读下载全文

作  者:刘耀隆 Liu Yaolong(Wuhan Metro Group Co.Ltd.,Wuhan,Hubei 430070)

机构地区:[1]武汉地铁集团有限公司,湖北武汉430070

出  处:《江西建材》2023年第11期276-278,共3页Jiangxi Building Materials

摘  要:明挖法和暗挖法在施工时均会破坏原有的地质结构,导致地表下沉,因此,文中提出了地铁车站基坑支护中盖挖半逆作法施工技术,并以实际工程为例,对盖挖半逆作法、明挖法和暗挖法这三种施工方法的地表下沉情况进行试验测试,结果表明,盖挖半逆作法地表下沉量最小,提高了基坑的安全性和稳定性。Open excavation method and dark excavation method will destroy the original geological structure during construction,leading to surface subsidence.Therefore,the semi-reverse construction technology of digging the middle cover of the foundation pit support of the subway station is put forward.The project overview is intorduced,and the surface subsidence of the three construction methods,open excavation method and dark excavation method is tested.The experimental results show that the surface subsidence of the semie-xcavation method is the minimum,which improves the safety and stability of the foundation pit.

关 键 词:地铁车站 基坑支护 盖挖半逆作法 施工技术 

分 类 号:G642[文化科学—高等教育学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象