检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:冯平 FENG Ping(China Railway Signal Communication Information Group Co.,Ltd.,Chengdu,Sichuan Province,610000 China)
机构地区:[1]通号通信信息集团有限公司,四川成都610000
出 处:《科技资讯》2023年第24期36-39,共4页Science & Technology Information
摘 要:通过自带基准站并利用北斗实时动态载波相位差分定位技术(Real-Time Kinematic,RTK)对铁路通信铁塔发生的水平位移、铁塔垂直度、塔基沉降进行连续不断测量和监控,解决以往铁塔监测系统误报、漏报率高、设备故障率高以及安装难度高、安装要求苛刻等施工难题,通过野外环境实验数据表明其精度满足中国铁路总公司发布的《铁路通信铁塔监测系统》(Q/CR851—2021)标准要求。This article proposes a system that continuously measures and monitors the horizontal displacement,tower verticality and tower base settlement of railway communication towers by using built-in reference stations and Beidou real-time kinematic(RTK)carrier phase differential positioning technology,and solves the construction problems of the false alarms,high false alarm rates,high equipment failure rates and installation difficulties and strict installation requirements of previous tower monitoring systems.Field environmental experimental data shows that its accuracy meets the standard requirements of"Technical Conditions for Railway Communication Tower Monitoring Systems(QC/R 851—2021)"issued by China Railway Corporation.
分 类 号:U285[交通运输工程—交通信息工程及控制]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38