人工湿地技术对水源地雨水径流污染阻控的应用研究  

Application of constructed wetlands to control rainwater runoff pollution from the water source

在线阅读下载全文

作  者:刘婷[1,2,3,4] 朱雯淅 曹承进 王迪芳[1,4] 都皓辰 李梦茁 黄民生 何岩 张亚婷[1,2,3,4] 李心童 LIU Ting;ZHU Wenxi;CAO Chengjin;WANG Difang;DU Haochen;LI Mengzhuo;HUANG Minsheng;HE Yan;ZHANG Yating;LI Xintong(Shanghai Key Lab for Urban Ecological Processes and Eco-Restoration,School of Ecological and Environmental Sciences,East China Normal University,Shanghai 200241,China;Technology Innovation Center for Land Spatial Eco-restoration in Metropolitan Area(Ministry of Natural Resources),Shanghai 200062,China;Shanghai Engineering Research Center of Biotransformation of Organic Solid Waste,Shanghai 200241,China;Institute of Eco-Chongming,Shanghai 202162,China)

机构地区:[1]华东师范大学生态与环境科学学院上海市城市化生态过程与生态恢复重点实验室,上海200241 [2]自然资源部大都市区国土空间生态修复工程技术创新中心,上海200062 [3]上海有机固废生物转化工程技术研究中心,上海200241 [4]崇明生态研究院,上海202162

出  处:《华东师范大学学报(自然科学版)》2024年第1期50-57,156,共9页Journal of East China Normal University(Natural Science)

基  金:国家科技重大专项(2017ZX07207001);上海市自然科学基金(21ZR1418600);自然资源部大都市区国土空间生态修复工程技术创新中心项目;上海有机固废生物转化工程技术研究中心项目(19DZ2254400)。

摘  要:设置了不同基质(砾石、加气混凝土)及是否种植美人蕉的不同人工湿地结构,通过小试实验对比各个工况对雨水径流污染的阻控效果.研究发现,加气混凝土与种植美人蕉的人工湿地组合成本略高(4.20元/工况),较其余工况高出1.00~2.90元/工况,但在运行的两个周期(交替运行30 h,落干48 h)内,NH_(4)^(+)-N、NO_(3)^(-)-N、TN、PO_(4)^(3-)、TP和COD_(Cr)的平均去除率分别为73.3%、47.0%、85.4%、56.4%、76.0%和65.5%,平均高出其余工况10.9%~18.8%,效果最优,性价比最高,适于推广应用.In this study,constructed wetland structures were established using different substrates(gravel and aerated concrete),with or without cannas planting.Subsequently,the effects of different working conditions on rainwater runoff pollution were investigated through small experiments.The cost of the constructed wetland with aerated concrete and cannas(4.20 yuan/working condition)was slightly higher(1.00~2.90 yuan/working condition higher)than those under other working conditions.However,in both cycles of operation(i.e.,alternating operation for 30 h and drying for 48 h),the average removal rates of NH_(4)^(+)-N、NO_(3)^(-)-N、TN、PO_(4)^(3-)、TP and COD_(Cr) were 73.3%,47.0%,85.4%,56.4%,76.0%,and 65.5%,respectively.These values were higher than those under other working conditions by an average of 10.9%~18.8%.Thus,this constructed wetland structure had the best effect and the highest cost performance.Therefore,it is suitable for promotion and application.

关 键 词:饮用水源地 雨水径流污染 人工湿地 面源污染 供水安全 

分 类 号:X506[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象