管道预制设计在工程项目建设期的应用  

Pipeline Prefabrication Design During the Construction Phase of An Engineering Project

在线阅读下载全文

作  者:郑亚强 姜浩 马庆 王新星 董强 苏宇宁 ZHENG Yaqiang;JIANG Hao;MA Qing;WANG Xinxing;DONG Qiang;SU Yuning(Kunlun Digital Intelligence Company Ref ining Business Department,Beijing 100000,China)

机构地区:[1]昆仑数智科技有限责任公司,北京100000

出  处:《化工管理》2024年第4期106-111,共6页Chemical Engineering Management

摘  要:石油建设行业中管道施工一直是项目中的重难点专业,尤其前期管道二次设计工作,耗费大量人力。为提高施工单位进行管道轴测图二次设计的工作效率和质量,提出通过解析设计IDF/PCF文件,获取管道模型文件以及设计基础数据。通过对模型文件进行二次设计获取施工需要的焊缝信息、材料信息等,并通过自动生成轴测图等功能,提高管道预制设计的效率以及准确性。Pipeline construction in the petroleum construction industry has always been a difficult specialty in the project.Especially the secondary design of pipeline in the early stage consumes a lot of manpower.In order to improve the efficiency and quality of the secondary design of pipeline axonometric drawing for construction units,it is proposed to obtain the pipeline model file and the design base data by analyzing the design IDF/PCF file.Through the secondary design of the model file to obtain the construction needs to weld information,material information and so on.And through the automatic generation of axonometric drawing and other functions,to improve the efficiency and accuracy of pipe prefabrication design.

关 键 词:预制设计 焊缝 管道安装工程 IDF 

分 类 号:TP311.5[自动化与计算机技术—计算机软件与理论]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象