检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:XU Jianguo LIU Rongjun LIU Hongxia
机构地区:[1]PetroChina Jilin Oilfield Company,Songyuan 138000,China
出 处:《Petroleum Exploration and Development》2023年第6期1445-1454,共10页石油勘探与开发(英文版)
基 金:Supported by China National Major Project of Science and Technology(2016ZX05046-004);PetroChina Major Project of Science and Technology(2017B-4905);PetroChina Jilin Oilfield Company Major Project of Science and Technology(JY21A2-12).
摘 要:Based on imbibition replacement of shut-in well in tight oil reservoirs, this paper expounds the principle of saturation rebalancing during the shut-in process after fracturing, establishes an optimization method for shut-in time after horizontal well volume fracturing with the goal of shortening oil breakthrough time and achieving rapid oil breakthrough, and analyzes the influences of permeability, porosity, fracture half-length and fracturing fluid volume on the shut-in time. The oil and water imbibition displacement in the matrix and fractures occurs during the shut-in process of wells after fracturing. If the shut-in time is too short, the oil-water displacement is not sufficient, and the oil breakthrough time is long after the well is put into production. If the shut-in time is too long, the oil and water displacement is sufficient, but the energy dissipation in the formation near the bottom of the well is severe, and the flowing period is short and the production is low after the well is put into production. A rational shut-in time can help shorten the oil breakthrough time, extend the flowing period and increase the production of the well. The rational shut-in time is influenced by factors such as permeability, porosity, fracture half-length and fracturing fluid volume. The shortest and longest shut-in times are negatively correlated with porosity, permeability, and fracture half-length, and positively correlated with fracturing fluid volume. The pilot test in tight oil horizontal wells in the Songliao Basin, NE China, has confirmed that the proposed optimization method can effectively improve the development effect of horizontal well volume fracturing.
关 键 词:tight oil horizontal well volume fracturing imbibition displacement oil saturation balance shut-in time influence factor development effect
分 类 号:TE357[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.70