检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:造鹏飞 ZAO Pengfei(Jiangxi Provincial Water Conservancy and Hydropower Construction Group CO.LTD.,Nanchang 330200,China)
机构地区:[1]江西省水利水电建设集团有限公司,江西南昌330200
出 处:《河南水利与南水北调》2023年第11期84-85,共2页Henan Water Resources & South-to-North Water Diversion
摘 要:为探索围井法在水利工程高压摆喷防渗墙性能检测方面应用的具体流程及效果,在分析围井法检测原理及技术应用要点的基础上,以位于永修县梅棠镇大塘村的枹桐水库为例,对水库大坝除险加固所采用的三管法高压摆喷灌浆工艺进行概述,并对围井法检测过程及结果进行了分析探讨。分析结果为水利工程大坝除险加固中应用围井法检测高压摆喷灌浆防渗施工质量提供了可靠依据。The purpose of this paper is to explore the specific process and effectiveness of the application of the surrounding well method in the performance detection of the high-pressure swing spray grouting anti-seepage walls in water conservancy projects.Based on the analysis of the detection principle and technical application points of the surrounding well method,taking the Futong Reservoir located in Datang Village,Meitang Town,Yongxiu County as an example,the three pipe high-pressure swing grouting process technology used to strengthen the reservoir dams is summarized.The detection process and results of the the surrounding well method are analyzed and discussed.The analysis results provide a reliable basis for the application of the surrounding well method to detect the quality of high-pressure swing grouting anti-seepage construction in the reinforcement of water conservancy project dams.
分 类 号:TV64[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.100.3