装配式钢结构建筑与既有建筑活动连接技术研究  被引量:2

RESEARCH ON CONNECTION TECHNOLOGY BETWEEN PREFABRICATED STEEL STRUCTURE BUILDING AND EXISTING BUILDING ACTIVITIES

在线阅读下载全文

作  者:刘斌[1] 张巧茹 Liu Bin;Zhang Qiao-ru

机构地区:[1]北京建工四建工程建设有限公司,北京100075

出  处:《建筑技术开发》2024年第1期9-11,共3页Building Technology Development

摘  要:在医院改扩建工程中,由于已有的医疗工作不能停歇,固需要尽快完成改扩建施工,以减少对医院正常运营的干扰,传统的钢筋混凝土结构较难满足上述要求。相对而言,装配式钢结构体系主要构件的加工制作均在工厂制作完成,其现场安装施工周期短,且对周围病护区和正常医疗工作影响小。通过研发一种与既有建筑可调标高的活动连接,以满足医院扩建工程的要求。In the hospital reconstruction and expansion project,the existing medical work can not stop,need to complete the reconstruction and expansion construction as soon as possible,as far as possible to reduce the interference to the normal operation of the hospital,the traditional reinforced concrete structure is difficult to meet the above requirements.Relatively speaking,the processing of the main components of the prefabricated steel structure system is completed in the factory,and the on-site installation and construction period is short,which has little influence on the surrounding disease care area and normal medical work.Through the development of a movable connection with the existing building adjustable height,it can meet the requirements of the hospital expansion project.

关 键 词:装配式钢结构 可调钢托座标高 活动连接 

分 类 号:TU741[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象