检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘惠娟[1] LIU Hui-juan(Guangxi Vocational College of Water Resources and Electric Power,Nanning 530023,China)
出 处:《广西水利水电》2024年第1期85-89,共5页Guangxi Water Resources & Hydropower Engineering
摘 要:根据全国最新“三区三线”划定成果,对原南宁市五化灌区马兰渡槽设计方案进行了变更。通过将原马兰渡槽设计方案与最新“三区三线”划定成果进行比较,提出了原址倒虹吸、原址渡槽两个设计变更方案。随后,从工程占地、地质条件、结构布置、施工运维等方面分析了各设计变更方案的优缺点,综合比选确定原址倒虹吸方案为最优设计方案。The original design scheme of Malan aqueduct in Wuhua Irrigation Zone of Nanning City has been changed based on the latest national regulations on"Three Districts and Three Lines".By comparing the original design scheme of Malan aqueduct with the latest delineation results of"Three Districts and Three Lines",two new design schemes of the original site inverted siphon and the original site aqueduct have been proposed.The advantages and disadvantages of two new design schemes were analyzed from the aspects of engineering land occupation,geological conditions,structural layout,construction and operation maintenance.The original site inverted siphon scheme was determined as the optimal design scheme through comprehensive comparison and selection.
分 类 号:TV672.5[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145