检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蒋忆文 JIANG Yi-wen(Guangxi Water&Power Design Institute Co.,Ltd.,Nanning 530023,China)
机构地区:[1]广西水利电力勘测设计研究院有限责任公司,南宁530023
出 处:《广西水利水电》2024年第1期132-134,共3页Guangxi Water Resources & Hydropower Engineering
摘 要:建设征地移民安置规划是工程建设的重要组成部分,是影响工程规模参数的决定性因素之一,更是事关工程顺利推进的关键内容。灌区项目、河道整治等线性水利工程与水库类项目的占地特点存在差异,移民安置规划侧重点也有所不同。本文对线性水利工程移民安置规划进行分析探讨,并以DTX灌区项目为例进行说明,为其他线性水利工程项目建设征地移民安置规划提供参考。Land acquisition and resettlement planning is an important component of engineering construction,is one of the decisive factors affecting the project scale parameters,and is also a key content related to the smooth progress of the project.There exists difference in the land occupation characteristics of linear water conservancy projects such as irrigation zone project and river regulation project and reservoir projects,so the focus of resettlement planning also varies.The author discussed the resettlement planning for linear water conservancy project,taking DTX Irrigation Zone Project as example.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.225.234.109