检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王磊[1] 彭铃铃 WANG Lei;PENG Ling-ling(Guangxi Water&Power Design Institute Co.,Ltd.,Nanning 530023,China)
机构地区:[1]广西水利电力勘测设计研究院有限责任公司,南宁530023
出 处:《广西水利水电》2024年第1期140-143,共4页Guangxi Water Resources & Hydropower Engineering
摘 要:风险调查是社会稳定风险分析的基础性工作,是识别项目风险因素、制订风险防范化解措施、判断风险等级的重要依据。本文结合线性水利工程的突出特点,从风险调查的内容和重点、调查方法的选择、调查的准备工作、调查组织实施要点等方面,对线性水利工程社会稳定风险调查工作的要点进行了探讨。Risk investigation is the fundamental work of social stability risk analysis,and is an important basis for identifying project risk factors,formulating risk prevention and resolution measures and judging risk level.Combined with the outstanding characteristics of linear water conservancy project,the authors discuss the key points of social stability risk investigation from the aspects of content and focus of risk investigation,selection of investigation method,preparation before investigation,key points of organization and implementation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117