新建南沙港铁路西江特大桥施工控制技术  被引量:1

CONSTRUCTION CONTROL TECHNOLOGY OF XIJIANG LARGE BRIDGE OF NEWLY BUILT NANSHA PORT RAILWAY

在线阅读下载全文

作  者:郭藩威 Guo Fan-wei

机构地区:[1]中铁十一局集团第一工程有限公司,湖北襄阳441104

出  处:《建筑技术开发》2024年第2期110-112,共3页Building Technology Development

摘  要:跨西江主桥采用(2×57.5+172.5+600+4×57.5)m双塔钢箱混合梁斜拉桥结构,斜拉桥主梁由钢箱梁和混凝土箱梁组成,采用非对称混合梁斜拉桥形式。主桥中跨及合龙段钢箱梁采用悬臂拼装施工,其余钢箱梁及现浇梁采用支架现浇施工。采用有限元仿真计算、几何监测、应力监测、斜拉索索力监测调整等关键控制技术,保证桥梁线形状态良好。The main bridge across the Xijiang River adopts(2×57.5+172.5+600+4×57.5)m double-tower steel box mixed beam cable-stayed bridge structure.The main beam of the cable-stayed bridge is composed of steel box girder and concrete box girder,and adopts the form of asymmetric mixed beam cable-stayed bridge.The steel box beams in the middle span and closing section of the main bridge are constructed by cantilever assembly,and the other steel box beams and cast-in-place beams are constructed by support cast-in-place.The key control techniques,such as finite element simulation calculation,geometry monitoring,stress monitoring,cable force monitoring and adjustment,are used to ensure the good shape of the bridge.

关 键 词:非对称 混合梁 斜拉桥 线形控制 

分 类 号:U446.1[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象