超大口径超长距离排海顶管施工的管控要点  被引量:2

Key Points of Construction Control of Super-large Diameter and Super-long Distance Sea Discharge Pipe Jacking

在线阅读下载全文

作  者:朱亮 ZHU Liang(Shanghai Jianhao Engineering Consultancy Co.,Ltd.,Shanghai 200030,China)

机构地区:[1]上海建浩工程顾问有限公司,上海200030

出  处:《建筑施工》2024年第2期233-236,共4页Building Construction

摘  要:结合嘉兴市污水处理扩容工程外排三期(排海管扩容部分)项目,针对大口径超长距离顶管施工中所存在的困难进行了技术攻关。解决了混凝土沉井节段划分及工厂化制作、沉井分节下沉、封底混凝土浇筑、顶管施工等过程中存在的难题,确保了项目顺利实施。总结的管理工作经验,可为类似项目提供借鉴。Combined with the third phase of the sewage treatment expansion project in Jiaxing City(the expansion part of the sea pipe),technical difficulties in the construction of large-diameter and ultra-long-distance pipe jacking are tackled.The problems in the process of concrete caisson section division and factory production,caisson subsection sinking,bottom sealing concrete pouring and pipe jacking construction are solved,which ensures the smooth implementation of the project.The summarized management experience can provide reference for similar projects.

关 键 词:大口径顶管 超长距离 混凝土浇筑 分节下沉 

分 类 号:TU71[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象