检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:牟学乾 Mou Xue-qian(Weifang Wuzhou Dingyi Steel Tower Co.,Ltd.,Weifang 262100,Shandong Province,China)
机构地区:[1]潍坊五洲鼎益铁塔有限公司,山东潍坊262100
出 处:《科学与信息化》2024年第4期121-123,共3页Technology and Information
摘 要:我国电力系统发展中,局部地区面临高压直交流输电线路走廊交叉问题,可采取同塔多回高压输电架线模式,解决匮乏的线路走廊资源情况,需要优化设计输电铁塔结构,保证铁塔可靠性。文章以山东菏泽巨野彭越(段庄)220kV变电站110kV送出工程为例,简要分析同塔多回高压输电铁塔建设要求及结构设计,并以此为基础,提出实际应用措施,从而为相关工作者提供参考。In China’s power system development,local areas are facing high-voltage straight and alternating current transmission line corridor crossing problem.The same tower multi-circuit high-voltage transmission overhead mode can be used to solve the scarcity of line corridor resources.It is necessary to optimize the design of transmission tower structure,and ensure the reliability of the tower.This paper takes 110 kV transmission project in Heze Juye Pengyue(Duanzhuang)220 kV substation as an example,briefly analyse the same tower multi-circuit high-voltage transmission tower construction requirements and structural design,and accordingly proposes the practical application measures,so as to provide reference for the relevant workers.
分 类 号:TM7[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33