检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:齐鲁尚 沈寿亮 丁少伟 QI Lushang;SHEN Shouliang;DING Shaowei(China Design Group Co.,Ltd.,Nanjing 210014,China;College of Agricultural Science and Engineering,Hohai University,Nanjing 211100,China)
机构地区:[1]华设设计集团股份有限公司,江苏南京210014 [2]河海大学农业科学与工程学院,江苏南京211100
出 处:《水运工程》2024年第2期139-146,共8页Port & Waterway Engineering
摘 要:黄河干流宁夏中卫市康滩—营盘滩河段长约9 km,平面宽窄相间,呈藕节状。针对康滩—营盘滩河段河道弯曲、支汊纵横、航槽不明、流态紊乱等问题,采用河工模型试验对疏浚浅区、拓宽航槽的航道整治效果进行分析,并根据试验结果对设计方案进行优化。最终确定中宁大桥滩采用新开航槽弯曲半径大于550 m,与上、下游航道平顺衔接,太平滩采用疏浚、筑坝和填槽相结合的整治措施,能够有效改善通航水流条件,保障通航安全。The river reaches from Kangtan to Yingpantan in Zhongwei of Ningxia,the mainstream of the Yellow River,is about 9 km long,wide and narrow in plan,and has the shape of a lotus root joint.Considering the problems of channel curvature,bifurcations,unknown channel,violent turbulence in the river reaches from Kangtan to Yingpantan,we use the river model test to analyze and research the effect of channel regulation by dredging the shallow area and widening the channel,and optimize the design scheme according to the test results.It is found that the bending radius of the newly opened fairway at Zhongning Bridge beach is more than 550 m and the upstream and downstream fairways are smoothly connected with each other,and at Taiping beach,the rehabilitation measures of dredging,impoundment and slot filling are carried out,which can effectively improve the flow conditions and ensure the safety of navigation.
分 类 号:U617[交通运输工程—船舶及航道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7