检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨志虎 YANG Zhihu(Yunnan Huadian Jinsha River Midstream Hydropower Development Co.,Ltd.,Liyuan Power Generation Branch,Lijiang 674100,China)
机构地区:[1]云南华电金沙江中游水电开发有限公司梨园发电分公司,云南丽江674100
出 处:《云南水力发电》2024年第2期120-122,共3页Yunnan Water Power
摘 要:厂房是水电站的主要组成部分,而地面是厂房重要的基础建筑,必须有着高标准的施工要求。环氧自流具有干净、整洁、耐压、耐腐蚀、防静电、易清洁等特点,可以很好的用于厂房地面大面积涂刷。以梨园水电站厂房地面为例,就环氧自流平大面积应用施工技术的主要措施和工艺进行阐述,为水电站厂房地面环氧自流平大面积施工提供经验。The factory building is the main component of a hydropower station,and the ground is an important foundation building for the factory building,which must have high standard construction requirements.Epoxy self leveling has the characteristics of cleanliness,tidiness,pressure resistance,corrosion resistance,anti-static,and easy cleaning,and can be well used for large-scale painting of factory floors.Taking the Liyuan hydropower plant as an example,this article elaborates on the main measures and processes of large-scale application of epoxy self leveling construction technology,providing experience for large-scale construction of epoxy self leveling on the ground of hydropower plant buildings.
分 类 号:TV731[水利工程—水利水电工程] TU767.4[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15