时局、地域与全面抗战时期的云南铁路建设  

Current Situation,Region and Yunnan Railway Construction during the Comprehensive Anti-Japanese War

在线阅读下载全文

作  者:张永帅[1] 高延超 ZHANG Yong-shuai;GAO Yan-chao

机构地区:[1]云南师范大学,云南昆明650500

出  处:《青海民族研究》2023年第4期187-194,共8页Qinghai Journal of Ethnology

基  金:国家社科基金西部项目“空间视角下近代西南沿边开放与区域经济变迁研究”(批准号:22XZS014)阶段性成果。

摘  要:全面抗战爆发后,由于抗战的需要,国民政府提出滇缅铁路、川滇铁路、石(石屏)佛(佛海)铁路修筑计划。但受各方面条件限制,滇缅、滇川铁路仅有极少一部分通车,石佛铁路只进行了勘测,没有修筑。全面抗战时期云南铁路建设进展缓慢,成绩不明显,是战争局势与云南地域环境共同作用的结果。After the outbreak of the Comprehensive Anti-Japanese War,due to the needs of the war,the Nationalist Government proposed the construction of the Yunnan Myanmar Railway,the Sichuan-Yunnan Railway,and the Shiping Fohai Railway.However,due to limitations of various conditions,only a small part of Yunnan Myanmar and Yunnan-Sichuan railways have been opened,and the Shiping Fohai Railway has only been surveyed without construction.The slow progress and unclear achievements of railway construction in Yunnan during the period of the Comprehensive Anti-Japanese War were the results of the joint action of the war situation and the regional environment in Yunnan.

关 键 词:全面抗战时期 云南铁路 时局 地域 

分 类 号:C95[社会学—民族学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象