检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭冬云 高晓峰 GUO Dong-yun;GAO Xiao-feng(PowerChina Zhongnan Engineering Corporation,Changsha 410014,China;Engineering Safety and Disaster Prevention Department,Changjiang River Scientific Research Institute,Wuhan 430010,China;Research Center on Water Engineering Safety and Disaster Prevention of Ministry of Water Resources,Changjiang River Scientific Research Institute,Wuhan 430010,China;National Center for Dam Safety Engineering Technology Research,Changjiang River Scientific Research Institute,Wuhan 430010,China)
机构地区:[1]中国电建集团中南勘测设计研究院有限公司,湖南长沙410014 [2]长江科学院工程安全与灾害防治研究所,湖北武汉430010 [3]长江科学院水利部水工程安全与病害防治工程技术研究中心,湖北武汉430010 [4]长江科学院国家大坝安全工程技术研究中心,湖北武汉430010
出 处:《水电能源科学》2024年第1期175-179,共5页Water Resources and Power
基 金:国家自然科学基金项目(52279123)。
摘 要:抽水蓄能电站钢蜗壳一般均采用充水保压埋入方式,在正常运行过程中,蜗壳内季节水温变化将影响钢蜗壳—混凝土接触关系,继而影响充水保压蜗壳的承载特性。为此,基于运行期钢蜗壳温度监测结果,研究了运行期钢蜗壳实际温度变化情况,并采用有限元方法研究了运行期钢蜗壳—混凝土接触关系的变化规律、结构承载特性及不平衡水推力分载情况。结果表明,在机组投产后正常运行年内,钢蜗壳内季节水温变化对钢蜗壳—混凝土接触闭合时机及空间分布影响显著;夏季水温升高将导致蜗壳外包混凝土承载比显著升高,应确保混凝土配筋满足强度和正常使用要求;而在冬季水温降低时止推环将起到承担不平衡水推力的主要作用,与此同时,座环也承担了约30%~40%的不平衡水推力,说明充水保压蜗壳设置止推环和加强座环锚固非常必要。P-type spiral case structure(SCS)is generally adopted in pumped-storage power plants.Under normal operating conditions,the contact status of steel spiral case(SSC)and surrounding concrete is subject to seasonal changes in water temperature of SSC.Accordingly,it will affect the load-bearing mechanism of the SCS.Based on in-situ measured data of the temperature,seasonal changes in temperature of SSC were analyzed.Furthermore,the contact behavior,loadbearing mechanism of SCS and share of unbalanced hydraulic thrust were studied with FEA.The results show that the seasonal changes in water temperature of SSC will affect the gap-closing behavior of the SSC-concrete contact.In summer,the rise in water temperature will increase the bearing ratio of the surrounding concrete.Moreover,the thrust ring is more prominent in winter,and the stay ring actually shares about 30%-40%of the unbalanced hydraulic thrust.Accordingly,the design of the thrust ring and the anchoring of the stay ring are necessary.
关 键 词:抽水蓄能电站 充水保压蜗壳 季节水温变化 钢蜗壳—混凝土接触关系 不平衡水推力
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.50