检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨学峰 梁磊 周星泽 晏耿成[1] 王龙 邢佳 Yang Xuefeng;Liang Lei;Zhou Xingze;Yan Gengcheng;Wang Long;Xing Jia(New Energy Business Department,PetroChina Changqing Oilfield Company,Xi’an 710018,China)
机构地区:[1]中国石油长庆油田公司新能源事业部
出 处:《石油科技论坛》2024年第1期122-126,共5页PETROLEUM SCIENCE AND TECHNOLOGY FORUM
基 金:中国石油天然气集团有限公司项目“油气田清洁能源利用技术与新能源智能管控系统研究”(编号:2022KT2603)。
摘 要:随着国家“双碳”目标持续推进,长庆油田大力推进绿色低碳转型发展,探索建立新能源与油气井站融合发展模式。利用油气田井场、站点剩余空间建设分布式光伏,为油气设备设施供电。长庆油气田研究制定分布式光伏发展规划,创新技术路线,加强分布式光伏与工艺制度变革、油井提高采收率、提高终端电气化率间的融合发展。项目组织实施中,与专业设计单位合作推进设计标准化,严格落实层级监督、属地监管,施工建设市场化;运行管理中,加强数字化平台建设、光伏组件清洁管理、巡检和故障处置。2022年建成井站分布式光伏56MWp,2023年发电小时数1463h,发电量7692×10^(4)kW·h,节约电费4231万元,效益显著。With the progress made in fulfillment of China’s dual carbon goal,Changqing Oilfield spared no efforts to promote green and low-carbon transitional development and establish the model for oil and gas development in harmony with new energy.Changqing used the remaining space in the well sites and stations of the oil and gas fields to construct distributed photovoltaic power stations to provide electric power for oil and gas facilities.Changqing Oilfield also studied and formulated the distributed PV development plan and technological innovation roadway while strengthening efforts for transformation of PV power and technical system,EOR of oil wells and improvement of terminal electrification rate.When the project was organized and carried out,the oilfield cooperated with the specialized design units to promote the design standardization and strictly adhered to the principles for level-by-level supervision,on-the-site supervision and marketized construction.As for operation and management,the oilfield stepped up construction of digital platform,management of PV components cleaning,inspection and treatment of accidents.The photovoltaic power constructed and connected to the stations reached 56 MWp in 2002.The annual power generating hours reached 1463h in 2023 with power generation amounting to 7692×104kW·h,saving 42.31 million yuan of electricity expense and making remarkable economic performance.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222