检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡剑杰 钱军祥 HU Jianjie;QIAN Junxiang(Changjiang Survey,Planning,Design and Research Co.,Ltd.,Wuhan 430010,China)
机构地区:[1]长江勘测规划设计研究有限责任公司,湖北武汉430010
出 处:《水电与新能源》2024年第2期54-57,61,共5页Hydropower and New Energy
摘 要:根据葛洲坝二江电站水力条件,对拦漂排重建设计,采用固定锚固点结合浮动锚固点的布置方案,优化拦漂排受力体系,选用以“双层塑料浮筒+网衣+重锤+高强聚乙烯主绳”为主排的拦漂排结构,确定主绳、浮筒、网衣及重锤的规格、型号、技术参数等,均满足规范要求。拦漂排重建后运行至今状态良好,其布置方案及结构设计理念可作为同类型工程应用借鉴。Considering the hydraulic conditions of the Erjiang Power Station in Gezhouba Hydropower Project,the reconstruction scheme of the float trash barrier is designed.A layout scheme with fixed anchorage points combined with floating anchorage points is adopted.The force bearing system of the barrier is optimized.A structure with double-layer plastic buoys,net cover,heavy hammers,and high-strength polyethylene main ropes as the main barrier is selected.Then,the specifications,types and technical parameters of the main ropes,buoys,net cover and heavy hammers are determined to meet the regulatory requirements.After the reconstruction,the float trash barrier has been operating in good condition until now.Its layout scheme and structure design ideas can be useful reference for similar projects.
分 类 号:TV34[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.147.72.31