作 者:崔亚鹏 CUI Yapeng(State Grid Shaanxi Yulin Power Supply Company,Shaanxi Yulin 719000,China)
出 处:《农村电气化》2024年第2期36-38,共3页Rural Electrification
摘 要:倒闸操作是变电站最常见且重、难的一项工作之一,倒闸操作的正确对电网的安全稳定运行起着至关重要的作用,倒闸操作的顺畅也会有时间的长短之分,根据多年在变电站实际工作经验,针对110 kV变电站倒闸操作时间过长的原因进行了简要分析探讨,并找出倒闸操作时间过长的原因及相应对的措施。供相关变电运维人员参考。The reverse gate operation is one of the most common and heavy and difficult work of the substation,the correct operation of the reverse gate plays a vital role in the safe and stable operation of the power grid,and the smooth operation of the reverse gate will also have the length of time,I have based on many years of practical work experience in the substation,for the 110Kv substation The reasons for the long operation time of the reverse gate were briefly analyzed and discussed,and the reasons for the long operation time of the reverse gate were found out and the corresponding measures.For the reference of relevant substation operation and maintenance personnel.
分 类 号:TM727[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38