检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨耀宗 Yang Yaozong(China Design Group,Nanjing,China)
机构地区:[1]华设设计集团股份有限公司,江苏南京
出 处:《科学技术创新》2024年第5期110-113,共4页Scientific and Technological Innovation
摘 要:为了提升互通立交桥梁设计的精确性和可靠度,文章结合具体工程实例,采用BIM正向设计,对其实施过程以及设计成果进行了分析,包括数据收集、模型构建、专业间的协同合作、模型优化和最终成果的输出,通过BIM技术优化成桥整体计算和顶推施工过程,提升了互通立交桥梁设计质量和效率,为互通立交桥梁的工程设计和施工提供了技术保障,具有工程实践意义。In order to improve the accuracy and reliability of the design of interchange bridges,this paper combines specific engineering examples,uses BIM forward design,analyzes its implementation process and design results,including data collection,model construction,inter-professional collaboration,model optimization,and output of final results.The BIM technology optimizes the overall calculation of the bridge and the jacking construction process,improves the design quality and efficiency of the interchange bridge,and provides technical support for the engineering design and construction of the interchange bridge,which has engineering practical significance.
关 键 词:互通立交桥 BIM技术 正向设计 Midas Civil
分 类 号:U442.5[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43