检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:龚广明 GONG Guangming(CITIC General Institute of Architectural Design and Research Co.,Ltd.,Wuhan 430014,China)
机构地区:[1]中信建筑设计研究总院有限公司,武汉市430014
出 处:《建筑电气》2024年第1期34-39,共6页Building Electricity
摘 要:针对文物建筑保护修缮设计的特点,以武汉剧院为例,分析文物建筑保护修缮时的设计难点;从电气用房、供配电系统、照明系统、设备和管线安装、防雷接地系统、火灾自动报警系统等方面阐述文物建筑保护修缮电气设计要点及相应解决措施。Given the characteristics of protective renovation of cultural heritage buildings,the design difficulties in protective renovation of cultural heritage buildings are analyzed by using the Wuhan Theater as an example.The key points in electrical design of protective renovation of cultural heritage buildings and the appropriate solutions are expounded from the aspects including electrical equipment room,power supply and distribution system,lighting system,equipment and pipeline installation,lightning protection&earthing system and automatic fire alarm system,etc.
关 键 词:文物建筑 保护修缮 设计要点 现场踏勘 变配电所 管线安装 照明系统 防雷接地
分 类 号:TU242.2[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15