超长超高薄壁水处理构筑物混凝土施工技术及质量控制措施  

Concrete Construction Technology and Quality Control Measures for Ultra-long,Ultra-high,and Thin-walled Water Treatment Structures

在线阅读下载全文

作  者:封明村 FENG Mingcun(The Third Engineering Company of CCCC Fourth Harbor Engineering Co.,Ltd.,Zhanjiang 524005,Guangdong,China)

机构地区:[1]中交四航局第三工程有限公司,广东湛江524005

出  处:《工程技术研究》2023年第21期141-143,共3页Engineering and Technological Research

摘  要:污水处理厂水处理构筑物通常采取超长超高薄壁钢筋混凝土结构,施工过程中易出现冷缝、蜂窝、麻面、裂缝、烂根、漏筋、孔洞等质量问题,进而影响水处理构筑物的抗渗性及耐久性,需采取一定的技术方法和管理措施加以避免。文章通过隆昌市污水综合治理项目-甲子湾污水处理厂工程改良生化池施工案例,分析了超长超高薄壁水处理构筑物混凝土施工技术及质量控制方法,旨在为今后类似工程提供借鉴。The water t reatment st ructures in sewage treatment plants usually adopt ultra-long,ultra-high and thin-walled reinforced concrete structures.During the construction process,quality problems such as cold joints,honeycombs,pockmarked surfaces,cracks,rotten roots,bar leakage,and holes are prone to occur,which in turn affects the impermeability and durability of water treatment structures.It is necessary to take certain technical methods and management measures to avoid them.This paper analyzes the concrete construction technology and quality control method of ultra-long,ultra-high and thin-walled water treatment structure through the construction case of improved biochemical tank in Jiaziwan sewage treatment plant engineering,a comprehensive sewage treatment project in Longchang City,aiming to provide reference for similar engineering in the future.

关 键 词:超长超高薄壁 水处理构筑物 混凝土施工 冷缝 蜂窝 裂缝 

分 类 号:TV544[水利工程—水利水电工程]

 