检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张乐 刘长龙 寇磊 陈征 张璐 徐元德 王胜 薛德栋 ZHANG Le;LIU Changlong;KOU Lei;CHEN Zheng;ZHANG Lu;XU Yuande;WANG Sheng;XUE Dedong(CNOOC(China)Limited Tianjin Branch,Tianjin 300452,China;CNOOC EnerTech-Drilling&Production Co.,Tianjin 300452,China)
机构地区:[1]中海石油(中国)有限公司天津分公司,天津300452 [2]中海油能源发展股份有限公司工程技术分公司,天津300452
出 处:《油气藏评价与开发》2024年第1期133-137,150,共6页Petroleum Reservoir Evaluation and Development
摘 要:海上油田单管分层测调注聚工艺不能满足井斜大于60°的井况,同时测调时需要钢丝作业配合,平均单井测调用时6 h,测调效率低,无法真正意义上实现井下温度、压力、流量的实时监测与注入量调整。在介绍海上油田缆控智能注聚新技术原理、适用性与特点的基础上,研发出缆控智能注聚工作筒、大流量下高保黏通道及地面控制器等关键配套工具。实验表明,工作筒形成节流压差小于4 MPa,保黏率大于85%,性能较好。现场应用表明,缆控智能注聚技术在大斜度井的分层注聚调试过程中,可实时反馈流量、压力、温度等监测数据,提高注聚井测调效率和油藏配注达标率,为海上油田聚驱提高采收率提供了有效的技术支撑。The single-tubing layered testing and adjustment injection process for offshore oilfields cannot meet the conditions of wells with inclinations greater than 60°.At the same time,steel wire operation is required during logging,and a single well takes six hours on average.The logging efficiency is low,and it cannot truly achieve the real-time monitoring of downhole temperature,pressure,flow rate,and injection volume adjustment.On the basis of introducing the principle,applicability,and characteristics of intelligent polymer injection technology with cable control in offshore oil fields,key supporting tools such as cable control intelligent polymer injection pipe,high viscosity maintaining channel under large flow rate,and ground controller have been developed.Experiments have shown that the pipe has better performance with a differential throttle pressure of less than 4 MPa and a viscosity retention rate of more than 85%.Field applications demonstrated that the cable-controlled smart polymer injection technology can provide real-time feedback on flow rate,pressure,temperature,and other monitoring data during the layered polymer injection debugging process in high-inclination wells.This improves the efficiency of polymer injection well testing and adjustment and the standardization rate of reservoir allocation,offering effective technical support for enhancing the recovery factor in offshore oilfield polymer flooding operations.
分 类 号:TE357[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49