作 者:潘尚启 PAN Shang-qi(China Railway Eryuan Engineering Group Co.,Ltd.,Chengdu 610031,China)
机构地区:[1]中铁二院工程集团有限责任公司,成都610031
出 处:《价值工程》2024年第5期13-15,共3页Value Engineering
摘 要:勘察设计项目进度控制与勘察设计企业降本增效息息相关。本文通过理论研究、案例分析等方法,研究了网络计划技术在公路勘察设计项目进度控制中的应用。研究表明,相对于工期计划表格和横道图,网络计划可以清晰地表达工作之间的逻辑关系,通过关键线路和关键工作分析,可以制定有针对性的进度控制策略,为项目总体及专业负责人进行项目进度控制提供有力支撑。The schedule control of survey and design projects is closely related to the cost reduction and efficiency increase of survey and design enterprises.This paper investigated the application of network planning technique in schedule control of highway survey and design project,by means of theoretical research,case analysis and other methods.Research shows that with respect to schedule tables and Gantt charts,network planning technique can clearly express the logical relationship of works,a targeted schedule control strategy can be developed with the help of critical line and critical work analysis.It provides strong support for the overall and professional leaders of the project to control the project schedule.
分 类 号:U412.2[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.130