检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:余鹏飞 熊小伏[1] 朱继忠[1,2] 何祥桢 南东亮 YU Pengfei;XIONG Xiaofu;ZHU Jizhong;HE Xiangzhen;NAN Dongliang(State Key Laboratory of Power Transmission Equipment&System Security and New Technology(Chongqing University),Chongqing 400044,China;School of Electric Power Engineering,South China University of Technology,Guangzhou 510641,China;State Grid Electric Power Research Institute of Xinjiang Electric Power Company,Urumqi 830011,China)
机构地区:[1]输配电装备及系统安全与新技术国家重点实验室(重庆大学),重庆市400044 [2]华南理工大学电力学院,广东省广州市510641 [3]国网新疆电力有限公司电力科学研究院,新疆维吾尔自治区乌鲁木齐市830011
出 处:《电力系统自动化》2024年第1期119-130,共12页Automation of Electric Power Systems
基 金:国家自然科学基金资助项目(U1866603)。
摘 要:新型电力系统中系统惯性降低及触发连锁跳闸风险因素的增多,使得防范连锁跳闸的重要性愈发凸显。针对这一问题,提出一种融合储能的电网连锁跳闸抑制方法。利用储能的快速响应特性,在潮流转移初期即投入储能调控电网潮流,可快速抑制导线温升,为后续水火电机组及其他慢速响应的备用电源参与调控赢得时间。文中提出了基于网络动态最大电气介数、风险扫描和需量计算的“三要素法”储能配置决策方法,包括构建反映网络薄弱环节和时变风险的连锁跳闸防控预案,解决了连锁跳闸抑制的储能资源时空选择问题;基于输电线路动态热特性,提出了储能与水火电协同调控时的储能功率和容量计算方法,确定了防范连锁跳闸所需要的储能资源规模。针对IEEE 30节点网络给出了N-1和N-2故障计算案例,验证了所提方法的有效性。The decrease in system inertia and the increase in risk factors for triggering cascading trips in the new power system makes the importance of preventing cascading trips increasingly prominent.Aiming at this problem,a method integrated with energy storage is proposed for suppressing cascading trips in power grid.By using the fast response characteristics of energy storage,the energy storage is put into operation to regulate the power flow in the early stage of power flow transfer,which can quickly suppress the temperature rise of the wires and gain time for the subsequent participation of hydrothermal power units and other slow-responding backup power sources in regulation.Based on dynamic maximum electrical betweenness of the network,risk scanning and demand calculation,the paper proposes a“three-step”allocation decision-making method for energy storage,including constructing a cascading tripping prevention and control plan that reflects network weaknesses and time-varying risks and solving the spatial and temporal selection problem of energy storage resources to suppress cascading tripping.Based on the dynamic thermal characteristics of transmission lines,a calculation method for energy storage power and capacity during the coordinated regulation of energy storage and hydrothermal power is proposed,and the scale of energy storage resources required to prevent cascading tripping is determined.The N-1 and N-2 fault calculation cases are provided for IEEE 30-bus network to verify the effectiveness of the proposed method.
关 键 词:连锁跳闸 快速响应 潮流 继电保护 输电线路 动态热特性 储能
分 类 号:TM73[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.17.212