检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王子林 WANG Zilin(Henan Pingmei What Liang Bei Second Well Coal Industry Co.,Ltd.,Xuchang 454003,China)
机构地区:[1]河南平煤神马梁北二井煤业有限公司,河南许昌461675
出 处:《技术与市场》2024年第2期100-104,109,共6页Technology and Market
摘 要:基于梁北二井主副井基岩段水害特点,提出工作面帷幕预注浆加壁后注浆的水害注浆治理方案,采用理论分析和数值计算的方法,给出工作面预注浆方案和井壁壁后注浆方案设计,并进行了实践,取得了良好的治理效果。Based on the characteristics of water damage in the main and auxiliary well bedrock section of Liangbei No.2 well,the water damage grouting treatment scheme of the working face curtain pre-grouting and the grouting after the wall is put forward.Using the method of theoretical analysis and numerical calculation,the working face pre-grouting scheme and the wall post-grouting scheme are designed,and the field practice is carried out.The field practice has achieved a good treatment effect.
分 类 号:TD745[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7