Flood risk assessment of check dams in the Wangmaogou watershed on the Loess Plateau of China  

在线阅读下载全文

作  者:GAO Ze-chao SHI Peng LI Zhan-bin LI Peng BAI Lu-lu JIA Yi-li CUI Lin-zhou 

机构地区:[1]State Key Laboratory of Eco-hydraulics in Northwest Arid Region of China,Xi'an University of Technology,Xi'an 710048,China [2]Key Laboratory of National Forestry Administration on Ecological Hydrology and Disaster Prevention in Arid Regions,Xi'an University of Technology,Xi'an 710048,China [3]Northwest Institute of Forest Inventory,Planning and Design,National Forestry and Grassland Administration,Xi’an,Shaanxi 710041,China [4]College of Life and Environmental Science,Wenzhou University,Wenzhou 325035,China

出  处:《Journal of Mountain Science》2023年第12期3631-3647,共17页山地科学学报(英文)

基  金:supported by the National Natural Science Foundation of China (Grant 42077073, 42373063, 42307447);Natural Science Basic Research Plan in Shaanxi Province of China (2022KJXX-62)。

摘  要:Check dams have been widely used in China’s Loess Plateau region due to their effectiveness in erosion and flood control.However,the safety and stability of the check dam decrease with the operation process,which increases the probability of dam failure during flood events and threatens local residents’ life and property.Thus,this study simulated flood process of the check dam failure in the Wangmaogou watershed in Yulin City,Shaanxi Province,China,calculated different types of inundation losses based on the flood inundation area within the watershed,and determined the number of key flood protection check dams by classifying the flood risk levels of the check dams.The results showed that 5 dams in the watershed were subject to overtopping during different rainfall return periods,which was related to their flood discharge capacity.Dam failure flood process showed a rapid growth trend followed by slow decrease,and the time of flood peak advanced with increase in the return period.After harmonization of evaluation scales,the magnitude of flood inundation losses can be ranked as:economic losses(212.409 million yuan) > life losses(10.368 million yuan) > ecological losses(6.433 million yuan).The risk value for both individual dams and the whole dam system decreases as the return period increases.The number of key flood protection check dams in the Wangmaogou watershed was 2,3,3,3,4,and 5 for floods with return periods of 10,20,30,50,100,and 200 years,respectively.The results provided a theoretical basis for the safe operation and risk evaluation of check dams in the Loess Plateau Hills watershed.

关 键 词:Check dam Return period Flood control risk Dam failure Inundation loss 

分 类 号:TV87[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象